EXAMPLE
1
Construction Type
Roof Truss & Floor Truss/Post & Beam
25' x 25' Columns with 6" outside
wall. Engineered 140 mph winds.
76' trusses are set into place 5 at a
time. Connector plates on the ends of the trusses will align with wall
studs.
This 2 story office/laundromat
Built by Dealers-
J & J Consultants
(top of page)
|
|


|
|

|

|

|
|
|
|
|
|
US PATENT
4,551,957
4,688,358
4,697,393
4,720,957
4,756,133
|
|
EXAMPLE
2
Construction Type:
Combination of Purlin and Truss style frame.
This beautiful 3,300 Sq Ft home was built
in Okeechobee, Florida by Watt Construction.
Main structure was erected by four men
during Memorial weekend.
(top of page)
|
|


|
|
|
|
|
|
|
|
|
|
|
|
|
|
EXAMPLE
3
Construction Type:
Purlin Style Frame.
This 1,100 Sq Ft home was built for Lennar Homes in Cutler
Ridge, Florida.
Structure was erected and concrete Floor
& Footer was placed within 2 hours!
Turn-key Construction time was 11 days.
Later, when hurricane Andrew ripped
across Southern Florida in 1992, buildings
were toppled like cardboard boxes. This home withstood a direct assault of
the storm and sustained no structural damage.
(top of page)
|
|


|
|

|
|
|
|
|
|
|
|
|
|
|
|
|
|
EXAMPLE
4
Construction Type
Purlin Style
This 53’ high five-story 13,600
square-foot home with a metal roof, constructed in Lakeland, FL,
includes an underground garage and a cupola. The steel framing makes it
easier to accommodate the 13-foot ceilings on each story.
Framing structure manufactured on Madray
Steel's home manufacturing machinery.
All pre-cut pieces were then shipped to
the site and erected in approximately 30 days.
(top of page)
|
|



|
|

|

|

|
|
|
|
|
|
|
|
|
|
|
|
|
|
EXAMPLE
5
Construction Type
2" x 3" Roof and Open Style Floor Trusses with 6" Walls.
This 2100 Sq Ft home was built in Knoxville, TN
(top of page)
|
|

|
|
EXAMPLE
6
Construction Type
2" x 3" Roof Trusses with 6" Walls.
Knoxville, TN
(top of page)

|

|
 
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EXAMPLE
7
Jamison Inn
Multi-Story construction is quickly and
easily designed to meet any Local, Regional, or National Building Code. Our
comprehensive computerized design makes part identification more precise
and reduces errors. Staging large shipments is more precise.
(top of page)
|
|


|
|

|

|

|
|
|
|
|
|
|
|
|
|
|
|
|
|
EXAMPLE
8
Habitat For Humanity
(top of page)
|
|

|
|
EXAMPLE
9
Utility Storage Building
Lake Placid, FL
(top of
page)
|

|
 
|
|
EXAMPLE
10
This is in the British West
Indies.
Dealer Vic Georgeff
constructed this 14-plex with two supervisors and seven islanders in 5
weeks. This includes assembling the trusses.
(top of page)
|
|

|
|
EXAMPLE
11
This structure was erected in Rawanda, Africa
(top of page)
|
|

|
|
|
|
|
|
|
|